|
ZJ20X Bearing Heater |
|
*Operating Procedures
1. According to the diameter of bearings, select the appropriate yoke iron, put the yoke iron placed string bearing on the core of the host-side surface should be in line with Euparagonimus.
2.In the heating process, to use Digimite (reprovisioning) measure rise temperature of inner-side plane of bearing. When the temperature rise to meet the requirements, see the counting time digital, and stop heating, press the stop button automatic demagnetization, remove the yoke iron, you can remove the bearing to assemble.
3.To heat the same specification bearing, to turn the switch in the position of time control, set the heating time, when the bearing is heated to the set time automatically power off.
4.When work is finished, to turn the switch in the position of stop and cut off the power. |
Technique Parameter of ZJ20X Bearing Heater
|
Type Parameter |
ZJ20X--I |
--II |
--III |
--IV |
--V |
--VI |
--VII |
Rated Power (KVA) |
2.2 |
5.5 |
7.5 |
11 |
13 |
18 |
22 |
Rated Voltage(V) |
220 |
380 |
380 |
380 |
380 |
380 |
380 |
Rated Current(A) |
10 |
14.5 |
19.7 |
28.9 |
34.2 |
47 |
58 |
Heating Workpiece |
Inner Diameter(mm) |
30-85 |
85-160 |
120-250 |
150-360 |
180-400 |
Gear-specific of internal combustion engine |
Max Diameter(mm) |
280 |
350 |
400 |
450 |
500 |
Width(mm) |
100 |
150 |
180 |
200 |
220 |
Weight(kg) |
36 |
105 |
120 |
135 |
150 |
180 |
250 |
|
*Installation and Testing
1.To place the yoke iron on the surface of host core;
2.Check the consistent of the connection between plug and socket, should be well grounded, and then plug in the socket with controlled switch.
3. Turn the function selector switch to the manual position, turn off the power, here, the red indicator light.
4.Press the start button, the host is electrified, here, the green indicator light and red out, press the stop button, the red light and green light out. At this point, the end of debugging and put into use. |
|